Skip to content
Interior design, fit-outs, furniture and decor for businesses, developers and institutions
Established in Riyadh in 2013
Parent company of an ecosystem that includes LuxuryLine and Meter
More than 280 technicians and craftspeople
Contributions to private-sector and government projects

Location, sequence, and quality

Architectural Finishing

Complete fit-out: clear work items and coordinated execution.

Elevenz executes interior finishing packages in accordance with approved plans and specifications. We take over spaces after plastering within the agreed-upon scope and coordinate works with specialized teams and engineering supervision until inspection, snag closing, and handover.

Retail kiosk with wood finishes and integrated lighting
Retail kiosk with wood finishes and integrated lighting

Deliverables

  1. 01Materials and items approved before execution
  2. 02Approved reference sample
  3. 03Inspection records per the project plan
  4. 04Snag closure and handover

What we need to start the study

  • Current site condition
  • Available drawings or specifications
  • Required scope of work
  • Preferred materials if any

What the proposal includes

  • Materials, modifications, and costs are approved according to the project scope and agreed-upon specifications.
  • Fire resistance, moisture resistance, and insulation are determined according to the use and the approved project classification and product specifications.
Wall finishes in varied materials
Wall finishes in varied materials
High-ceiling living room with integrated finishes
High-ceiling living room with integrated finishes
Office passage with coordinated flooring, ceilings, and lighting
Office passage with coordinated flooring, ceilings, and lighting

Service details

Ceilings

  • Flat and multi-level gypsum board ceilings.
  • Cornices and coves for concealed lighting.
  • Gypsum tiles, aluminum, slats, and decorative wood ceilings.
  • Moisture or fire-resistant panels according to the required use and classification.
  • Sound and thermal insulation solutions and acoustic tiles according to specifications.

Gypsum and glass partitions

  • Dry partitions with one or two layers on galvanized structures.
  • Sound and thermal insulation inside partitions.
  • Glass partitions with or without frames, doors, and accessories.
  • Fire-resistant partitions according to the project's approved classification.

Cladding and walls

Wood, stone, marble, and porcelain cladding, as well as fabric and decorative elements, with details that suit the space and the project's identity.

Paints

Surface preparation, puttying, and sanding; water-based and acrylic paints for walls and ceilings; and decorative finishes like stucco, texture, and microcement, with options for health facilities and facades according to project requirements.

Tiles and flooring

  • Porcelain, including large sizes, natural and synthetic marble, and ceramic.
  • Stair cladding, baseboards, and transition details between materials.
  • Parquet, engineered wood, vinyl, and carpet.
  • Epoxy flooring, and flooring works for parking and courts according to the scope.

Work control

  • Approval of materials and the reference sample.
  • Review of levelling, levels, joints and details.
  • Inspection per the project plan before snag closure and handover.

Work stages

  1. 01

    Site review and scope of work

    We review site readiness and drawings, identifying execution items and prerequisites for each stage.

  2. 02

    Approval of specifications and sequencing

    We agree on materials, work items, approval mechanisms, and the schedule before execution begins.

  3. 03

    Execution, inspection, and handover

    We coordinate execution stages and monitor quality, then review completed items and notes before handover.

Glass partitions in a workspace
Glass partitions in a workspace

FAQ

Does the service include interior and exterior finishes?

Yes. We focus on interior fit-out, and deliver facades and external spaces through our decor service when requested.

How are changes approved during execution?

Modifications and their impact on specifications, cost, and schedule are reviewed and approved according to the project's mechanism before implementation.

At what stage do you take over spaces?

We take over spaces after plastering within the agreed scope; the site survey and drawings define the required items.

How is work quality controlled?

We approve materials and the reference sample, review leveling, elevations, joints, and details, and conduct inspection according to the project plan before closing snags and handing over.

Are fire and moisture resistance considered?

Yes. We use fire- or moisture-resistant boards and partitions where required by the project's classification, backed by product certificates.

Request a quote for your projectProjects for this service

Other services